| Gas Turbine 3 |
|---|
GT3 at Leicester in 1961 |
|
| Specifications |
|---|
Configuration:
| |
|---|
| • Whyte | 4-6-0 |
|---|
| • UIC | 2'C |
|---|
| Driver dia. | 5 ft 9 in (1.753 m) |
|---|
| Length | 68 ft 0+1⁄2 in (20.74 m) |
|---|
| Loco weight | 79.80 long tons (81.08 t) |
|---|
| Tender weight | 44 long tons (45 t) |
|---|
| Prime mover | EM27L gas turbine |
|---|
| Transmission | Mechanical: flexible drive from gearbox onto middle driving axle |
|---|
| Train heating | Steam generator |
|---|
|
| Performance figures |
|---|
| Top speed | 90 mph (140 km/h) |
|---|
| Power output | 2,750 hp (2,050 kW) |
|---|
| Tractive effort | 38,000 lbf (169.03 kN) |
|---|
|
| Career |
|---|
| Railroad(s) | British Rail |
|---|
| Number | GT3 |
|---|
| Disposition | Returned to VF 1962; turbine removed; scrapped T.W. Ward, Salford, March 1966 |
|---|
|
GT3 was a prototype mainline gas turbine locomotive. It was built in 1961 by English Electric at their Vulcan Foundry in Newton-le-Willows to demonstrate its wares to British Railways. It was designed by Vulcan engineer J. O. P. Hughes and the project was started in the early 1950s. Externally, it resembled a steam tender locomotive. In the case of GT3, the tender carried diesel fuel.
Related pages
|
|---|
| Diesel shunters: | |
|---|
Diesel shunters (pre-TOPS): | |
|---|
| Main-line diesels: | |
|---|
Main-line diesels (pre-TOPS): | |
|---|
| Electrics: | |
|---|
Electrics (pre-TOPS): | |
|---|
| Departmental: | |
|---|
| Prototypes: | |
|---|
|